Reason for Rejection:
Your submission has been rejected because one or more dimensions on the inspection report are either not recorded or cannot be validated.
Why This Is Important:
It is essential to record all required dimensional measurements using the provided inspection template for our review. You must follow the correct inspection method specified at the quotation stage. Please refer to our guide on Inspection Levels and measurement requirements for more information.
Next Steps:
Re-inspect the Component:
Add the missing dimensions.
If any dimension is out of tolerance, please rework or remake the component and resubmit it for VQC.
Re-upload the part for VQC
Expectations:
Use the Geomiq Inspection template for all VQC requirements.
Verify that all required dimensions are recorded according to the specified inspection level.
Following these steps will ensure timely approval of your order for shipping.
Common Issues:
Do not use your own inspection template.
When CMM is required, use the Digital Printout generated by the XRF and attach it along with the Geomiq Inspection template.
Ensure all dimensions are labeled using a bubble.